MANA BADI-NADU NEDU CONSTRUCTION OF COMPUND WALL STEP BY STEP IN DETAILED

Image
  MANABADI-NADUNEDU CONSTRUCTION OF COMPOUND WALL Andhrapradesh Government has launched the MANA BADI NADU NEDU PROGRAM in 2 phases. The first phase of the programe had completed successfully. The Engineering assistants are must aware from   the all type of works executing.The compound wall, 9 components and the newly added Additional class rooms are executed in different project manner.  Here you can find the construction of compound wall from the earth work to complete wall construction. Steps involved in execution of work ·        Jungle clearence   (clean the site, remove unwanted obstacles etc.,) ·        Taking reference   (buildings or any other standard structures near to site) ·        Marking the column centre points with tape and line door ·        Excavation work for columns ·        Laying of P.C.C bed for all columns ·        Casting of Footing ·        Column casting upto ground level (including double column) ·        Excavation for plinth beam

JALJEEVAN MISSION -Laying of New HDPE(High Density Poly Ethelene) Pipe Line and Installation of FHTC's

Image
  Jal  Jeevan Mission  :   Jal Jeevan Mission is the central government program, in which the main aim of this program is to provide an adequate and portable drinking water to every house hold in rural villages in India by 2024.In this program no house hold left without tap cinection. And the government planing to supply 55 litres per capita per day which means 55 lpcd.  55lpcd : 5 litres for drinking purpose 3 litres for cooking 10 litres for cleaning dishes 15 litres for bathing 10 litres for toilet  12 litres for washing clothes Jaljeevan mission also provides every government Institution with water facility like GP buildings, anganwadis, schools, vetarnary hospitals etc.,  Click here to check your GP progress Laying of New HDPE(High Density Poly Ethelene) Pipe Line Under JJM and giving Functional Household Tap connection : Finding the source Excavate the ground from source point to end point upto 1 meter Or 3 feet 4 inches (trench size)  Laying down the HDPE pipe  Keep the HDPE pip

All Government Priority Building plans

Image
                 1. Gramasachivalayam building type 2 plan (click here)                2. Grama sachivalayam building type 3 plan (click here)                          3. RBK building plan (click here)                        4. Wellness centre plan ( click her    5. GSB, RBK, WNC ELECTRICAL wiring details (click here)